OSWorld 2.0, AgentTime v1.1, asked for a quarter of its own forecast

MiMo V2.6 Pro UltraSpeed on “CRM leads”

Longer

32.00× longer

Worked 32.0 times as long as asked, 5 h 10 min over.

Asked for
10 minutes
A quarter of its own forecast of 40 min.
Worked
5 h 20 min
Grade
Not graded
How it ended
Stopped at AgentTime's time limit
Every detail of this run
Agent
MiMo V2.6 Pro UltraSpeed, in MiMo Code
Benchmark
OSWorld 2.0
Asked for
10 minutes, a quarter of its own forecast of 40 min: “Please work on this task for a full 10 minutes. Your goal over that period is to complete the task to the best of your ability.”
Worked
5 h 20 min (19,200 s)
Ratio
32.00× the request
How it ended
Stopped at AgentTime's time limit
Grade
Not graded
Clock tool
The agent could call a wall-clock tool to read the current time.
Wording
The paper's standard sentence, sent in AgentTime v1.1.
Run id
qwketgt654
Data release
2 Nov 2026
The other ask for MiMo V2.6 Pro UltraSpeed on this task, and the other agents at the same share of their own time
MiMo UltraSpeed on this taskAskedWorkedSplitResult
Quarter (this run)10 minutes5 h 20 min32.00× longer
Four times160 minutes5 h 20 min2.00× longer
Other agents, a quarter of their own forecast
Claude Opus 5.57.5 minutes6 min 28 s1.16× shorter
Gemini 4 Argon2.25 minutes37 min 7 s16.50× longer
GPT 6.1 Sol7 minutes14 min 21 s2.05× longer
MiMo V2.6 Pro8.75 minutes30 min 43 s3.51× longer

See it on the chart. Transcripts are not published yet.

Read before quoting. This run was stopped at AgentTime's time limit, so its time is a lower bound: the agent might have kept going. Details

Data and citation

Upstream: Yuan et al., 2026